A successful modular project doesn't end with a great design; it begins with a professional installation. At Kembelt Gruppe, we specialize in the complex logistics required to transport and place 20ft and 40ft units in even the most challenging locations.
Phase 1: Site Preparation
Before the truck arrives, the ground must be ready. Unlike traditional buildings, container homes and offices don't always need a full concrete slab. We often recommend concrete footings or screw piles, which are faster, cheaper, and more sustainable.
Utility Connections & Final Touches
Once placed, your modular studio or garage is ready for final utility hookups (water, electricity, sewage). Because Kembelt units are pre-wired and pre-plumbed, the "plug-and-play" process takes only a few hours, not days.
Ready to Receive Your Unit?
Our logistics team handles the hard work so you can focus on your new space.
GET A DELIVERY QUOTEGlobal Reach & Safety
Whether you are building an industrial storage hub or a luxury office hub, we follow the strictest safety protocols. Our worldwide logistics network ensures that your shipping container conversion arrives on time and in perfect condition, ready for immediate use.